Underfloor heating

Tiler arrived to tile, got the underfloor heating out of the box ready to lay it, found out it was way too small, needed one twice the size. John went off to the shop to buy a 5m heating mat and thermostat, came back, all was well until the tiler laid it out, they'd only gone and given him a 10m mat! So back to the shop to exchange it. Finally the tiler got the mat down and the screed on top. While it was drying he got on with the only tiling he could in the shower area. He could only do so much until he had to leave to buy more floor adhesive ready for tiling the floor tomorrow. So this is as far as we have got in the bathroom, a screeded floor and some tiling in the shower.....







I cannot wait until it's finished. More tiling to be done tomorrow which will make a huge difference I think. Onwards and upwards!